Project location:
Project details:
- Client:
Multiflex Drafting & Engrg.
- Architect:
Hyundai Asian Technics PL
- Consultant:
Land Transport Authority
Colt Solution:
- Engineered Smoke Control System
- fixed Shading System
Colt Products:
Leaflet:
|
|
|
|
The fixed shading system was installed around the roof in the station
|
A Colt engineered smoke control system with fixed smoke barriers provides a clearer evacuation route during fire emergencies and a fixed Shading System combat solar heat gain. As a result, residents living in the Sengkang New Town area can now enjoy a convenient, efficient and safer feeder service connecting them to Sengkang MRT Station along the North East Line.
|